STANDARD EQUIPMENT:
• 3- point linkage cat. II, box type
• Mechanical unfolding
• 4 rows of heavy casts
• Mechanical lock for transport
• Cast section connected with frame by shackles
• Skids for harrows width 5-8 m
OPTIONAL EQUIPMENT:
• Galvanized frame – working surface connected to frame by hooks